Cooling tower capacity: 4,000 m³/h Area per section: 144 m²
Circulating water temperature, °C:
Inlet: +38°C
Outlet (summer): max. +28°C
PJSC “Dorogobuzh”, Russia, Dorogobuzh
р.
р.
Engineering Equipment Supply Construction
Cooling tower capacity: 500 m³/h
Area per section: 16 m²
PJSC “Acron”, Russia, Veliky Novgorod
р.
р.
Engineering Equipment Supply Construction
Cooling tower capacity: 2,700 m³/h Area per section: 144 m²
PJSC “Acron”, Russia, Veliky Novgorod
р.
р.
Engineering Equipment Supply Construction
Cooling tower capacity: 7,000 m³/h Area per section: 144 m²
PJSC “Acron”, Russia, Veliky Novgorod
р.
р.
Engineering Equipment Supply Construction
Cooling tower capacity: 7,000 m³/h Area per section: 144 m²
OJSC “Tatspirtprom”, Russia, Tatarstan, Kazan
р.
р.
Cooling capacity: 400 m³/h Area per section: 16 m² Circulating water temperature, °C: inlet +55°C Circulating water temperature, °C: outlet (summer) max. +25°C
JSC “NIFHI named after L.Ya. Karpov”, Russia, Obninsk
р.
р.
Engineering Equipment Supply Construction, 2012
Area per section: 64 m²
PJSC “Acron”, Russia, Veliky Novgorod
р.
р.
Engineering Equipment Supply Construction (2012)
Area per section: 64 m²
OJSC “Shchekinoazot”, Tula Region, Shchekinsky District
р.
р.
Engineering Equipment Supply Construction (2012)
Area per section: 64 m²
OJSC “Shchekinoazot”, Tula Region, Shchekinsky District
р.
р.
Major overhaul Cooling tower reconstruction Engineering Equipment supply (2014)
Cooling tower No. 2, type VG-70, capacity 3,000 m³/h